18.05.2025 Map with the location of RoR nodes at trunk and distribution level under the DCASA project. Share Related pages26.11.2025Kyrgyztelecom participated in the Kyrgyzstan IGF 2025 forumRead more14.11.2025Kyrgyztelecom and Turkmentelecom signed a Memorandum of Understanding on mutual cooperationRead more23.10.2025Employees of OJSC “Kyrgyztelecom” received information about the doctrine “National Spirit – Global Height.”Read more