18.05.2025 Map with the location of RoR nodes at trunk and distribution level under the DCASA project. Share Related pages18.08.2025OJSC “Kyrgyztelecom” provided the village of Kum-Aryk with high-speed internetRead more15.08.2025High-speed internet has been launched in the village of Kaindy.Read more06.08.2025On holding an open auction (repeated with a 25% price reduction) on September 8, 2025.Read more